The shed was given electricity last week and, shortly thereafter, acquired lights as well – two shop lights which gave off a surprising amount of illumination. We will have plenty of light by which to do laundry, even at night.
The electricity was provided by an electrician, all properly permitted and inspected. I installed the LED lights which were plug-ins and required no special talent beyond the ability to drill holes and screw in eyebolts.
The electrical wiring has 7 circuits: hot water heater (30A), dryer (30A), washer, air conditioner, interior outlets (5 of ’em), exterior outlets (2) and interior lights.
Next up: installation of the air conditioner, insulation and plumbing. I am hiring a contractor to do that work. When completed I will install paneling and flooring. Then, finally, we will be ready to install a washer, dryer and sink. That likely won’t happen until next fall. My goal, before leaving to head north, is to get the insulation installed and the air conditioner working.
I purchased a “smart” air conditioner – one which I can monitor and control from my cell phone. That will be pretty cool.
If it works.