The carpenter completed the installation of the interior walls and the ceiling today, so all that remains is the final plumbing and the trim. The final plumbing will be done next week – installation of the tankless hot water heater and the sink. But the trim will wait until fall. There is no compelling need to do the trim until the washer/dryer are ready to be installed and we have decided to wait until fall to do that. It seemed unwise to leave a brand-new washer/dryer pair in a shed which could be leveled by a hurricane.
The walls are actually flooring. We have one dark gray “accent” wall where the washer and dryer will reside and 3 cream-white walls. The white walls are Pergo. Can’t remember the manufacturer of the dark gray flooring. The ceiling is white vinyl soffit.
I was pretty pleased, once I got everything back into the shed, to see how empty it was. There will be plenty of room for the stuff we will bring south from our storage unit in MA.