The very last piece of the shed construction for this season was completed this morning when the tankless hot water heater was activated. We now have hot water in the shed, on demand. It takes about 10 seconds for the water to reach the sink. Or the washer, once it is installed.
Now I can shut it off until next season.
This final piece means that the final inspection can occur and the building permit can be closed out. That is the last building permit that I expect will be needed.
Until Jett decides she would like to add a toilet.
Anyway, we are done for now so no more exclamation point post titles.
!!!